City School of Aarhus
Education
- International Programmes at Bachelor's level
-
Bachelor of Engineering
- Admission requirements
-
Architectural Engineering
- General Part
-
Specialization and Bachelor Project
- Structural use of glass
- New office building - Fagbladsgruppen
- Media and Cultural Centre of Thy
- Dusager – office building of Grontmij Carl Bro in Skejby
- Structural design of Navitas
- City School of Aarhus
- Aros - Aarhus Art Museum
- Geoteknik – Bridge over Funder Å-dal
- Parametric design of a court yard roof
- The new main office of Promecon in Fredericia
- Vitus Bering Innovation Park
- Forum Horsens
- Bioprocess Engineering
- Civil and Structural Engineering
- Electronic Engineering
- Healthcare Technology
- Information Technology
- Mechanical Engineering
- Teaching Methods
- Business Engineer
- M.Sc.Eng
- Bachelor of Science
- PhD Studies
- Summer Schools
- Course Catalogue
- Download information
- FAQ
- Contact International Office
Description:
In a centralization process, the Municipality of Aarhus intends to build a new primary and lower secondary school where the buildings of Skt. Anna Gades School and Kroghsgades School are situated today. The school is meant for the pupils of Læssøesgades School and Fjordsgades School – in total approximately 1200 pupils.
The study is based on a proposal of the design of the school made by two students from Aarhus School of Architecture as their graduate project. Their design consists of three school sections in separate buildings connected by walkways on the first floor. Their graduate project is mainly focused on the superior design of the building, which has caused a lot of work making the design realistic.
The study is based on a proposal of the design of the school made by two students from Aarhus School of Architecture as their graduate project. Their design consists of three school sections in separate buildings connected by walkways on the first floor. Their graduate project is mainly focused on the superior design of the building, which has caused a lot of work making the design realistic.
The study is limited to the building containing the oldest pupils, which includes a large integrated gym. Based on the architects’ rough floor plans and 3D model the structural design of the building is elaborated, which includes an establishment of the static system. It is strived towards maintaining the architects’ ideas about materials, design and dimensions.

/mfn