Design of road and roundabout in Kolt
Education
- International Programmes at Bachelor's level
-
Bachelor of Engineering
- Admission requirements
- Architectural Engineering
- Bioprocess Engineering
-
Civil and Structural Engineering
- General Part
- Elective Courses
-
Specialization and Bachelor Project
- Separation of sewage system in Sunds
- Energy optimization of Vildbjerg School
- Future supply for future housing
- Energy optimization and environmental certification of buildings
- Economy optimization in construction techniques
- Atria - energy consumption and daylight conditions
- Road Bridge – pre-stressed concrete
- Intelligent glass facades – dynamic u- and g-values
- Canadian Solar Wall – experimental studies
- Expansion of Esbjerg Stadium
- Intelligent facade solution - potential of a Canadian Solar Wall on Navitas
- Analysis of crack propagation in shear reinforced concrete beams
- Roadway design between Viborgvej and the displaced Herredsvej
- Optimization of district heating networks
- The pile foundation of Isbjerget at Aarhus Harbour
- Design guide for solar walls
- Roadway design between Viborgvej and Herredsvej
- Rosenholm Estate – altering a barn into an office building
- Tender documents for Bering - Bedervejen
- Foundation Navitas
- Design of junction between E45 and M51 near Kliplev
- ETFE as climatic envelope – new greenhouse, The Botanical Garden Aarhus
- Sustainable alternatives to the prefabricated residential house
- Life cycle analysis and alternative energy sources
- Bearing constructions in glass
- Design of road and roundabout in Kolt
- Navitas – bearing constructions
- Warehouse construction
- The usefulness of heat pump’s
- Bypass east of Gl. Egaa
- The importance of the facade for energy and inside climate
- Development of Poland’s energy infrastructure
- Storm water drainage from Havndal
- Practical change management for the Danish building industry
- Conference Centre, structures
- Kjellerup-Truust transport system: Design, dimension and transient analysis
- Hørning Waterworks
- Electronic Engineering
- Healthcare Technology
- Information Technology
- Mechanical Engineering
- Teaching Methods
- Business Engineer
- M.Sc.Eng
- Bachelor of Science
- PhD Studies
- Summer Schools
- Course Catalogue
- Download information
- FAQ
- Contact International Office
Description:
Aarhus municipality is planning a future connection between Kolt Østervej and Genvejen in the south of Aarhus. The main purposes of this new road will be to act as distributer in a new residential in north-eastern Kolt, as well as channel traffic fast and easy to the main highway. The road will join Kolt Østervej in a planned roundabout and continue northeast servicing local inhabitants and end at Genvejen one kilometre away.
To maximize capacity it is to be analyzed if a roundabout is the best solution given the circumstances. In theory roundabouts are effective in distributing even amounts of traffic from the connecting roads, but leaving no options for future changes. Thorough comparisons of the different connections will have to be carried out in order to make the correct decision.
Pathways in Kolt are high priority and by deciding to place a roundabout, changes will be inevitable. Connecting paths from the new residential to the existing paths, requires safe solutions as the users often are children.
The project material will contain a roundabout planned in detail as a result of the above mentioned aspects as well as a design of the connecting road.
